九九久久久久99精品_日韩一区二区在线免费观看_综合国产第二页_精品免费二区三区三区高中清不卡

能夠提高油藏管理水平的智能完井技術(英)

[加入收藏][字號: ] [時間:2009-02-19  來源:E&P  關注度:0]
摘要:簡介:進行智能完井能夠提高油藏管理水平,由于采用了一系列新技術,現在可以進行的監測內容遠多于壓力和溫度。 First conceived as alternatives to costly or technically difficu...
簡介:進行智能完井能夠提高油藏管理水平,由于采用了一系列新技術,現在可以進行的監測內容遠多于壓力和溫度。

First conceived as alternatives to costly or technically difficult interventions, intelligent wells that can be monitored and controlled remotely have evolved into a powerful reservoir management tool. As a result, after initially slow industry-wide uptake, their number is projected to increase fivefold in the next five years. 


At the heart of intelligent wells are surface-actuated downhole valves, used to regulate flow from individual zones or laterals, and permanent downhole temperature and pressure sensors. Today, downhole control valves range from those with simple on-off controls to hydraulically actuated and electrically controlled, infinitely variable-setting chokes. These innovations permit engineers to design valves that can be remotely adjusted within a range of cross-sectional flow areas matched to a zone’s production profile. Schlumberger now reports a 97% reliability rate for its second-generation valves.

While the initial objective of intelligent well technology?extending well life?was effective, that was not the most efficient use of the technology. Instead, the technology’s true promise, the industry has come to understand, is best realized when intelligent wells are used as a tool for maximizing reserves recovery. This change in intelligent well identity ? from intervention avoidance to reservoir management tool ? has been greatly enhanced by the emergence of robust downhole permanent pressure and temperature sensors capable of functioning in harsh environments for extended periods of time. Their new role has also been furthered by increased longevity, the result of more reliable electrical connections that in the past had been a weak link in downhole electronics. Today, fully redundant, independently testable, mechanical and full-welded connectors and splices have delivered a step-change improvement in reliability.

Because of these new technologies, monitoring today includes much more than pressure and temperature data. Permanent downhole multiphase flowmeters, seismic sensors, and electrodes have been included to deliver formation imaging away from the well bore, and they are all being connected through control centers that facilitate almost instantaneous responses to changing conditions. Data from these intelligent completions are also used to continually enhance and update production models and simulations, perform and interpret production tests on individual zones and laterals, predict sand and water encroachment, and measure flow rate and water cut.

Smart choice

The advantages of reservoir monitoring and control are obvious. For example, since wells seldom cross only a single hydrocarbon-bearing zone, completion engineers are often forced to decide between commingling production from multiple zones and producing each zone sequentially. Historically, producing more than one zone at a time has been an option only when the zones are of compatible pressure and fluid composition, and no regulatory concerns exist. Two, three, and sometimes four perforated intervals also can be produced at the same time through completions in which each zone is mechanically isolated from the others and flowed to the surface through separate production strings.

Sequential production typically requires flowing one zone to its economic limit before plugging and abandoning it in order to move up the hole to complete the next zone.

This cycle is then repeated until all zones have been depleted. In almost all cases, this strategy leaves behind considerable reserves and results in poor production profiles because of extended periods of depletion within each zone.

In contrast, using intelligent completions in a sequential production scheme, which involves opening and closing each zone remotely from the surface, improves production by eliminating both intervention costs and poor production profiles. Variable-setting valves can also be used to eliminate sequential production in favor of commingling by managing flow from high-pressure zones to prevent crossflow.

This does not mean that intelligent completion technology guarantees added value wherever it is applied. Experience has shown that the degree to which production is improved by intelligent completions depends on such factors as porosity and permeability distribution within that reservoir. The decision to use intelligent wells does not require every well in a smart field to be an intelligent completion. The operator must first ascertain that the reservoir type in a given field is suitable for intelligent well technology and then make a similar determination for each well planned for the field.

Candidate screening processes range from a simple analytical approach to complex reservoir models. Given such inherent uncertainties as reservoir characteristics, produced fluid composition, well performance, and recovery efficiency, it is important to use a stochastic rather than deterministic approach in the screening process.

Guiding parameters

General experience-based guides for choosing an intelligent well strategy have emerged over time. In a reservoir with uniform permeability, for instance, remotely actuated valves would seem, at first glance, to be an effective tool for managing water influx and therefore increasing well life and ultimate recovery. But if the completion is to be set across a relatively short interval within that reservoir, an intelligent completion may not be economically justified since a sufficiently uneven fluid front may not develop. In other words, the oil and water streams may not be sufficiently distinct to allow control of one fluid flow stream without affecting the other, and an intelligent completion would be a waste of money.

While intelligent completions can be effective in layered reservoirs, for obvious reasons they are decidedly more efficient when the shale zone separating the sands is continuous and the seal impermeable. Therefore, within the same layered reservoir, some wells crossing reliably sealed layers are well-served by intelligent completions.

One set of mathematical models developed for candidate screening uses reservoir simulation and well simulation techniques to generate a comparative model of the benefits of intelligent completions. Scenarios are created to generate variance in reservoir performance affecting the timing of events requiring intervention, reservoir monitoring, or reservoir management and are often driven by geological uncertainty and reservoir heterogeneity.

In heterogeneous channel reservoirs, the benefits of intelligent completions depend on well performance, which, in turn, depends on well placement with respect to the permeability of the formation and connectivity of the channels. That is because the effectiveness of flow control valves depends on choking, which is a function of high deliverability. By their nature, however, the majority of heterogeneous reservoirs benefit from intelligent completions since their varying permeability and porosity tend to create just the kind of fluid front that variable-setting valves can best exploit.

Team effort in Saudi Arabia

In 2004, Saudi Aramco engineers drilled and completed a maximum reservoir contact (MRC) well as a proof-of-concept project. The well is in the Haradh field, the designation given the southwest portion of Saudi Arabia’s giant Ghawar field. The Haradh area was brought on production in three successive increments over nearly 10 years from May 1996 to January 2006. While Increment I was developed using conventional completions wells, experience led Saudi Aramco engineers to eventually include MRC, multi-laterals, and intelligent completions in final Increments II and III.

The A12 well in the Haradh area was originally completed from a horizontally set, 7-in. line. A 61⁄2-in. horizontal openhole section was then drilled from the bottom of the liner and a 41⁄2-in. liner set across a section that had incurred heavy fluid losses during drilling of the main well bore. Two more 61⁄2-in. laterals were drilled from the 7-in. liner and left as “barefoot,” or openhole, completions.

With this standard multilateral completion, no water was produced initially, but in less than one year, water cut had reached about 23%. As a result, available drawdown and overall production were reduced and treatment and disposal costs rose, prompting the operator to deem water-production control imperative.

In response, Schlumberger designed and deployed an intelligent completion system with multiposition, downhole flow control valves and surface flow-rate measurements to selectively manage water production from each of the three zones. Through optimization of the downhole control valves, water cut was reduced from 23% to almost zero.

The successful application of intelligent wells to the Haradh field, as detailed in a paper presented at the 2007 International Petroleum Technology Conference, held in Dubai, was the result of a project-management approach to the design, planning and installation processes. Five Schlumberger segments teamed with the Saudi Aramco facilities, production, drilling and workover; reservoir management; and reservoir description departments. Schlumberger and Saudi Aramco’s reservoir management and reservoir description departments built a multilateral well model in PIPESEM production system analysis software to calculate pressures opposite each lateral at various water cuts. The simulation estimated lateral performance across the valves over a range of pressure and flow rates.

Prior to starting the project, more than 30 multidisciplinary team members from Schlumberger and Saudi Aramco participated in a two-day forum to plan the project, run the completion on paper, agree on the design criteria and running procedures, and define responsibilities. Participants jointly developed a list of 28 action items in an effort to ensure a trouble-free operation.

The field team consisted of a completions installation crew, a reservoir evaluation wireline crew, a coiled tubing crew, and a multiphase flow testing crew managed through the Schlumberger advanced completions project manager. In view of the well’s workover history and the possible presence of casing deformations capable of affecting intelligent completion installation, the reservoir evaluation wireline and well services segments ran a USI UltraSonic Imager corrosion log on coiled tubing. The run confirmed the integrity of the casing and the suitability of QUANTUM gravel pack and MultiPort bypass packers with multiple porting. Using a PhaseTester portable multiphase well production monitoring system and the InterACT real-time monitoring and data delivery system, the team optimized the intelligent completion performance. This enabled the

Saudi Aramco engineers at their offices in town to adjust downhole flow-control valve settings in real time to maximize oil production and minimize water cut. 

During equipment testing and installation, and subsequent flow testing of the well, each of the valves was actuated through more than 10 complete cycles?110 position changes, or the equivalent of several years of typical operation. The well was fully flow-tested and put on production with minimal water production. Saudi Aramco engineers reported at the 2007 IPTC meeting that without the intelligent well approach, the well would have watered out and ceased production.

Tubing- and wireline-retrievable flow control valves. These intelligent flow control valves, unlike their predecessors, do not require wireline or coiled tubing intervention to close, open, or infinitely adjust the flow area. Instead, they are remotely actuated through a hydraulic capillary tube (left) or, in the case of the electrical systems, through an electrical signal to electromechanical actuators (right). Both valves shown are tubing-retrievable.


          您的分享是我們前進最大的動力,謝謝!
關鍵字: 油藏管理 完井 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
日本一本在线观看| 国产亚洲精久久久久久无码77777| 给我免费播放日韩视频| 国产在线视频一区| 亚州色图欧美色图| 亚洲欧美国产日韩天堂区| 中文字幕久热| 亚洲成av人影院| 国产精品第5页| 岛国一区二区三区| 女人被狂躁c到高潮| 欧美成人一品| 欧美老熟妇喷水| 欧美经典一区| 欧美xxxx黑人又粗又长精品| 日韩成人伦理| 国产va免费精品高清在线| 天堂中文字幕| 亚洲视频欧美视频| 日本jizzcom| 欧美一激情一区二区三区| 岛国电影中文在线| 精品免费在线视频| 7777久久亚洲中文字幕| 欧美激情一区二区三区不卡| 精品少妇久久久| 国产不卡高清在线观看视频| 中文字幕av久久爽一区| 日日摸夜夜添夜夜添国产精品| 香蕉视频色在线观看| 国产精品7m凸凹视频分类| 国产黄页在线观看| 色88888久久久久久影院| 亚洲欧洲精品在线| 91精品国产66| 鲁鲁狠狠狠7777一区二区| 亚洲图片综合网| 日韩黄色影片| 久久精品在线视频| 天天操夜夜拍| 亚洲精品一区中文| 猛性xxxxx| 亚洲成人av在线播放| 国产香蕉免费精品视频| 7777精品伊人久久久大香线蕉最新版| 性感美女一级片| 欧美日韩亚洲国产一区| 国产成人无码www免费视频播放| 亚洲自拍偷拍av| 国产裸体无遮挡| 悠悠色在线精品| 一本一道人人妻人人妻αv| 国产精品美女久久久久aⅴ国产馆 国产精品美女久久久久av爽李琼 国产精品美女久久久久高潮 | 午夜精品久久久久99热蜜桃导演| 在线视频日韩一区| 亚洲成av人电影| 校园春色 亚洲色图| 99精品在线免费在线观看| 久久久精品麻豆| 欧美艳星介绍134位艳星| 国产成人无码一二三区视频| 欧美色图激情小说| 香蕉视频网站入口| 欧美激情91| 亚洲熟女乱综合一区二区| 亚洲免费黄色| 老熟妇精品一区二区三区| 日日夜夜精品视频免费| 欧美 日韩 成人| 国产伦理精品不卡| 欧美成人精品一区二区免费看片| 972aa.com艺术欧美| 日本在线播放视频| 《视频一区视频二区| 国产理论片在线观看| 欧美日韩一区二区精品| 九九久久九九| 欧美成人免费网站| 一级毛片免费播放| 亚洲人成网站在线播| 成全视频在线播放大地| 美女国内精品自产拍在线播放| 国产精品㊣新片速递bt| 久久全国免费视频| av午夜在线| 国产在线视频91| 国产高清不卡| 亚洲乱码一区二区三区三上悠亚| 一区二区三区免费在线看| 国产在线播放观看| 婷婷成人基地| 亚洲美女高潮久久久| 久久久久99| 强制高潮抽搐sm调教高h| 99精品一区二区三区| 国产成人a v| 福利微拍一区二区| 久久精品免视着国产成人| 日韩精品在线免费观看视频| 免费网站www在线观看| 57pao成人永久免费视频| gogo在线高清视频| 国产一区不卡在线观看| 国产精品亚洲欧美一级在线| 国产黄色片免费在线观看| 99久久99视频只有精品| 伊人网综合视频| 国产成人一级电影| 蜜臀精品一区二区三区| 午夜一区二区三区视频| 欧美专区日韩| 国产亚洲一区精品| 男女视频在线观看免费| 亚洲一区二区三区久久 | 97久久综合区小说区图片区| 看av免费毛片手机播放| 亚洲成人直播| 亚洲一级理论片| 日本一二三不卡| 国产自产一区二区| 亚洲第一福利在线观看| 国产69精品久久久久孕妇| 成人精品一区二区三区电影免费| se69色成人网wwwsex| 免费国产黄色网址| 国产精品毛片在线看| 91视频综合网| 亚洲激情图片小说视频| 欧美性性性性性ⅹxxbbbb| 中文国产亚洲喷潮| 蜜芽在线免费观看| 日韩欧美亚洲精品| 久久蜜桃av| 91成人在线免费视频| 欧美激情一区二区三区| 五月婷婷六月色| 亚洲欧美日韩高清| 不卡在线视频| 日本a级片久久久| 成人免费看片39| 久久久久亚洲av无码网站| 高清免费成人av| 国产免费一区二区三区免费视频| 欧美高清一级片在线| 成视频年人免费看黄网站| 国产精品欧美一区二区| 国产精品久久久久久吹潮| 欧美极品欧美精品欧美| 午夜在线视频观看日韩17c| 国产极品在线播放| 色综合久久综合| 蜜桃av导航| 国产激情久久久| 四虎国产精品永久在线国在线| 亚洲视频在线观看一区二区三区| 老司机精品视频一区二区三区| 中文字幕精品视频在线观看| 欧美日韩国产a| 在线观看视频免费| 99久久一区三区四区免费| 丝袜连裤袜欧美激情日韩| 色噜噜在线观看| 国产精品盗摄一区二区三区| 欧美色欧美色| 欧美俄罗斯乱妇| 日韩电影免费观看高清完整版| 欧美国产激情视频| 久国产精品韩国三级视频| 国产又色又爽又黄又免费| 亚洲成人av在线| 91看片在线观看| 亚洲精品中文字幕在线| 欧美日韩视频| 日本三级黄色大片| 欧美日韩视频专区在线播放| 性欧美18+| 精品国产一区二区三区免费 | 国产欧美在线观看| 国产精品tv| 亚洲av综合一区二区| 亚洲欧美另类综合偷拍| 你懂的在线观看视频| 国产精品h在线观看| 国产丝袜一区| 四虎永久免费在线观看| 亚洲资源中文字幕| 麻豆视频免费看| 成人av资源| 国产精品伦理久久久久久| 久久久久久久久久久久国产| 欧美日韩国产小视频| 男女视频在线观看免费| 一区二区三区四区久久| 爽好久久久欧美精品| 国产精品日韩无码| 亚洲毛片在线看| sm捆绑调教国产免费网站在线观看| 久久久久久久久久久免费视频| 国产精品原创巨作av| 亚洲在线天堂|