摘要:簡介:海低油氣分離,液體助推是一種有效的油藏開發技術。從最近的幾個案例來看,如Pazflor、BC-10以及Perdido,與單純進行提升相比,利用新方法可以大大提高采收率,而成本增加微乎其微。 In subsea environ...
簡介:海低油氣分離,液體助推是一種有效的油藏開發技術。從最近的幾個案例來看,如Pazflor、BC-10以及Perdido,與單純進行提升相比,利用新方法可以大大提高采收率,而成本增加微乎其微。


In subsea environments, near-well installation of multiphase pumps has been a proven approach to achieving improved asset values and increased production. Yet while use of multiphase pumps is in many instances an effective solution, special consideration as to approach must be taken when challenging conditions exist such as are found in deeper water or with long tieback distances, or when heavy-oil production is involved.

Despite advances, multiphase pumping technology remains limited in its capabilities. Dynamic ? i.e., centrifugal and helico-axial ? pumps function with reasonable efficiency for single-phase, low-viscosity liquids. However, they become very inefficient when a high-viscosity liquid is combined with high percentages of free gas.

More effective oil reservoir exploitation can be achieved using subsea separation coupled with liquid boosting. This approach enables production at very low flowing tubing head pressure, around 500 psi, even when water depth approaches 10,000 ft (3,000 m) and step-out distance from the host exceeds 30 miles (48 km).

This method also is well suited for use where heavy oil or low-reservoir pressure is the rule. And it is especially effective when combined with gas-lift of the production wells.

Examples from several recent projects ? including Pazflor, BC-10, and Perdido ? demonstrate that gas-liquid separation prior to liquid boosting improves recovery considerably more than boosting alone, while adding only limited incremental technical costs. Single-phase pumping facilitated by gas-liquid separation delivers the performance needed to exploit a reservoir’s full potential, while providing enhanced flow-assurance capabilities.

What’s gone before

To date, the most commonly accepted method for improved subsea processing has been installation of a multiphase pump close to the well. These pumps have operated successfully for several years. Yet use has been limited to shallow-water and shorter tieback distance environments.

This is primarily due to pumping-technology limitations. To date, multiphase pump projects have been restricted to those requiring up to 700 psi of incremental drawdown. Deep water or long tiebacks require much higher pressures.

A “rule of thumb” can be applied to help understand how much pressure a pump might need to deliver as depth and distance increase: Take the water depth (in feet) and multiply by a typical multiphase gradient (0.3 psi/ft); plus the tieback distance (miles); and multiplied by a typical multiphase pipeline frictional loss (50 psi/mile).

Thus, for a reservoir in 6,000 ft (1,830 m) of water, located 15 miles (24 km) from a potential host, the water depth contributes 6,000*0.3=1,800 psi, while the step-out contributes 15*50=750 psi, for a total potential pump duty of 2,350 psi. Assuming pump-suction pressure equals fluid-boarding pressure, this value is equivalent to the required pump duty.

In reality, typical multiphase pump projects have operated with minimum suction pressures in the 1,000 to 1,500 psia range, with typical boarding pressures of around 250 psia. This is because a suction pressure of 500 psia could easily result in a free-gas volume above 85% for many Gulf of Mexico Miocene oils. The actual free-gas percentage is affected by the production gas-oil ratio, which itself is a function of any gas-cap production and the oil’s bubble point at suction conditions. Available head and hydraulic efficiency are poor for dynamic pumps under these circumstances.

While oil containing even higher free-gas levels can be processed, there will be a corresponding reduction in hydraulic efficiency and head. Operations involving gas-lift in the production wells ensure that multiphase pumping is found inadequate. Single-phase pumping facilitated by subsea gas-liquid separation will in many cases realize the potential of gas-lift.

Recent work with single-phase subsea, multistage centrifugal pumps has shown that 4,000 psi is possible with low-viscosity (<1 cP) liquids. Even this upper limit could be exceeded once subsea motor technology catches up with the pumping capabilities. Dynamic pumps can be applied in situations where the liquid viscosity exceeds ~100 cP at inlet conditions, but their ability to generate head is thereby somewhat compromised ? and severely compromised when free gas is added to the equation.

Finally, with hydrate management being one of the most crucial production areas to address, the separator also allows field operation outside the hydrate formation region.

Case use examples

To better understand a separator’s impact, three current projects using gas-liquid separation and liquid boosting will be examined.

For these recent projects ? BC-10, Pazlor, and Perdido ? the hydrate management philosophy is broadly the same. Venting of pressure at both ends of the pipeline enables the pressure to be safely reduced to outside the hydrate envelope.

In addition, oil that has been flashed at 500 psia in a subsea separator will have a new bubble point. This low bubble point means there is very little free gas, even under venting, thereby minimizing the possibility to form hydrates. This, plus the ability to vent from both ends of the pipeline, could give enough confidence regarding hydrate formation and remediation to forego other hydrate management technologies.

Other flow assurance concerns such as liquid slugging are also mitigated and it should be noted that where wax may be an issue, round-trip pigging through the gas line and back through the liquid line is still possible.

While all three projects use gas-liquid separation to achieve higher subsea reservoir recovery, two different separator types are used. The BC-10 and Perdido separators are identical and based on a caisson separator design. In these projects, multiphase fluids are conditioned in the inlet piping and enter the inlet block at a downward angle and at a tangent.

As a result, liquid disengages from the gas and swirls down the inside diameter of the caisson. The tangential velocity keeps the liquid from re-entraining in the gas traveling upward. There is approximately 100 ft (30 m) between the inlet nozzle and the normal liquid level. This provides upwards of 100 bbl (16 cu m) of liquid slug capacity. Just above the inlet is a gas polishing section with 32-in. inside diameter. With the gas levels envisaged for these two projects, this results in a relatively low K factor.

On the other hand, the Pazflor project uses a separator based on classic gas-scrubber design principles. In this case, the separator was made as large as possible. Here again there is approximately 20-ft (6-m) distance between the normal liquid level and the inlet nozzle is significant and provides excellent liquid slug handling capacity (75 bbl or 12 cu m). An inlet device coupled to sloping trays and troughs gives extremely good separation performance. These internals have been tested and qualified for sudden sand production levels of 10 wt% and have been shown not to clog.

For the two design types ? caisson separator and gas scrubber ? process-control sensors and liquid hold-up time deliver slightly differing performance. The caisson system in BC-10 and Perdido clocks three minutes of hold up, while the Pazflor design at maximum rate offers marginally less.

At BC-10 and Perdido, level control is calculated by differences in pressure vertically up the caisson. Although the level location can be +/- 10 ft (3 m), height changes are readily seen and the pump reacts quickly enough to maintain control. Control-system testing under transient flow and with signal delays has proven this concept. The Pazflor vessel will use a density profiler similar to that used in the Tordis project. Obviously, with less hold up, the system will have to react quickly. For this reason, Pazflor will use fiber-optic lines to carry sensor and control information to and from the host.

Final words

Subsea separation is one of the most innovative technologies being applied in the oil and gas industry today. The need exists to maximize recovery; increase pressure and hydrocarbon output at fields with low reservoir pressures; address hydrate formation risks; and reduce constraints on topside facilities.

Initial production treating at the seabed facilitates more effective exploitation of an oil reservoir. Most important, it leads to higher recoveries from subsea reservoirs.

Gas-liquid separation and liquid-boosting projects are being implemented globally as a performance solution where capabilities for traditional multiphase pumping are limited.

Application of this technology to reservoirs that can benefit from production-well gas-lift is also expected. Improved recovery, obtained with limited incremental cost, has been the means to justify gas-liquid separation and liquid boosting projects. Additional projects will follow as separator designs become smaller and technology qualification standardized.


          您的分享是我們前進最大的動力,謝謝!
關鍵字: 海底隔離 提升 增產 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
亚洲精品爱爱久久| 午夜国产在线观看| 国内精品久久久久影院色| 永久免费的av网站| 亚洲人成网www| 一区在线电影| 成人日韩在线| 999久久久| 毛片在线不卡| 欧美在线视频免费观看| h动漫在线视频| 国产香蕉一区二区三区在线视频| 国产卡二和卡三的视频| 在线中文字幕一区| 亚洲AV无码一区二区三区性| 国产精品色一区二区三区| 精品无码人妻一区二区三区品 | 国产激情精品久久久第一区二区 | 美女福利一区二区| 成人欧美一区二区三区在线湿哒哒| 日本亚洲一区| 欧美老少做受xxxx高潮| 波多野吉衣av| 亚洲系列中文字幕| 柠檬福利视频导航| 欧美va亚洲va| 国内精品久久久久久不卡影院| 欧美在线free| 成人羞羞国产免费图片| 欧美日韩国产影院| 国产精品视频一二区| 国产精品另类一区| 无码人妻丰满熟妇精品区| 久久久99免费| 男人的天堂一区| 99国产欧美另类久久久精品| 欧美精品99久久久| 成人精品gif动图一区| 天天看天天摸天天操| 国产一二三精品| 欧美性生给视频| 国产成人激情av| 高h视频免费观看| 成人av资源站| 久久婷婷一区二区| 91在线云播放| 欧美三级一区二区三区| 久久精品一区八戒影视| 精品国产午夜福利| 欧美国产日韩一二三区| 成人免费毛片男人用品| 中文字幕国产一区| 老熟妇一区二区三区| 国产精品不卡在线| 一级全黄裸体免费视频| 一二三四社区欧美黄| 国产色片在线观看| 五月天欧美精品| 污视频在线免费观看| 91成人网在线| 欧美成人久久电影香蕉| 日韩免费高清av| 免费尤物视频| 亚洲人成网站色ww在线| 国产成人综合美国十次| 久久精品亚洲一区| 天堂av在线资源| 琪琪第一精品导航| av中文字幕在线观看| 3d精品h动漫啪啪一区二区| 男人久久天堂| 日本一区二区三区视频在线播放| 在线播放成人| 日韩成人三级视频| 久久国产成人精品| 日韩精品视频网址| 视频一区视频二区中文字幕| www成人啪啪18软件| www.亚洲色图| 台湾佬中文在线| 亚洲午夜久久久久久久久电影网| 少妇荡乳情欲办公室456视频| 欧美三级三级三级| 大杳蕉精品视频在线观看| 亚洲欧美日韩爽爽影院| 最近中文字幕mv第三季歌词| 国产91精品久久久久久| 免费看美女视频在线网站| 成人羞羞视频免费| av日韩一区| 国产h视频在线播放| 91精品福利| 大黑人交xxx极品hd| 国产成人av一区二区| 国产精品一区二区三区四| 亚洲黄色小视频| 影音先锋中文在线播放| 欧美不卡一区二区| 3d黄动漫网站| 91爱视频在线| free性欧美| 一区二区视频国产| 欧美色女视频| 少妇被狂c下部羞羞漫画| 国产精品一区在线观看你懂的| 国产精品乱子伦| 亚洲精品乱码久久久久久黑人| 一区二区三区四区在线不卡高清 | 久久精品99久久久久久| 国产精品黄色在线观看| 黄色一级大片在线免费看国产| 欧美一区二区三区啪啪| 男女午夜网站| 全球成人中文在线| 国模冰冰炮一区二区| 国产精品无码免费专区午夜| 中文字幕乱码亚洲无线精品一区| 日本免费福利视频| 99re这里只有精品视频首页| 97精品人妻一区二区三区| 欧美日韩精品综合在线| 日日操天天摸| 91精品国产乱码久久久久久久久| sm久久捆绑调教精品一区| 最近中文字幕免费mv| 亚洲精品小说| 999久久久国产| 中文字幕日韩av资源站| 一道精品视频一区二区三区男同 | 中国女人内谢69xxxx视频| 日韩成人在线播放| 污视频免费在线看| 国产三区精品| 免费看成人吃奶视频在线| 亚洲天堂2024| 久久久国产精品不卡| 亚洲免费网站在线观看| 亚洲一区二区福利| 97在线观看免费观看高清 | 91搞黄在线观看| blackedav金发美女大战黑人| 45www国产精品网站| 欧美黑人疯狂性受xxxxx野外| 少妇av一区二区三区无码| 午夜亚洲性色福利视频| www.国产成人| 欧美吻胸吃奶大尺度电影| ·天天天天操| 成人国产亚洲精品a区天堂华泰| 国产精品一级在线观看| 日本高清一区二区视频| 成人动漫视频在线| 全国男人的天堂网| 国产一区二区三区在线看| 欧美一区二区三区在线观看免费| 色播五月综合| 欧美日韩精品| 国产无码精品在线播放| 色噜噜久久综合| 俄罗斯xxxx性全过程| 亚洲一区二区久久久久久久| 欧美日日夜夜| a级大片在线观看| 亚洲人xxxx| 日本羞羞视频| 国产精品黄视频| jizz性欧美23| 蜜臀av一区二区三区有限公司| 一区二区中文视频| 三级毛片在线看| 国产精品成人观看视频国产奇米| 日韩精品成人| 91玉足脚交白嫩脚丫| 1区2区3区精品视频| 欧洲一级视频| 国产有码一区二区| 日本成人7777| 免费看裸体网站| 午夜日韩在线电影| 国产男小鲜肉同志免费| 国产美女精品久久久| 香蕉视频国产精品| 国产一级视频在线播放| 欧美日韩不卡视频| 国产高清免费在线播放| 日本xxx免费| 免费看精品久久片| 亚洲精品一级片| 超碰97人人做人人爱少妇| 欧美日韩精品免费观看视欧美高清免费大片 | 久久久免费视频网站| 国产精品伊人色| 亚洲图片小说综合| 久久乐国产精品| 婷婷综合国产| 亚洲精品色午夜无码专区日韩| 午夜影院在线观看欧美| 国产主播在线资源| 日本一区二区三区在线视频| 亚洲深夜影院|