Active control is a key factor in intelligent well completions
Maximize final recovery of reserves through an exploitation strategy based on maximum control, real-time monitoring and closed-loop capability.  
Jesus Contreras and Fernando Kirnbauer, Baker Hughes Incorporated 
Intelligent Well System (IWS) completions provide absolute control over reservoir exploitation. The four most important reasons to install an IWS completion are to maximize final recovery of reserves, accelerate/optimize production, reduce intervention operations and minimize environmental impact.
The key factor in maximizing final recovery with an IWS completion is to provide the capability of modifying the production or injection conditions of the well according to the depletion process of the reservoirs or as the result of changing operational conditions. This is active control. The purpose of this control concept is to provide maximum capability to adapt to the variable conditions of the reservoir. There are two control levels: on-off and adjustable (choking capability).
MAXIMIZING FINAL RECOVERY
A coherent reservoir exploitation strategy is required to maximize final recovery of reserves in an economical way. Most of the time, the reservoir operational conditions are very complex, in some cases due to reservoir characteristics (deposition environment, many intercalations, high pressure/high temperature, faults, low or high productivity, gas cap, aquifers, etc.) and in other cases because of specific decisions made during the exploitation cycle. Through the control of the production or injection parameters of the wells, IWS completions help to correct or reduce the uncertainty associated with reservoir exploitation, increasing the possibility of maximizing final recovery of reserves.
ACCELERATE AND OPTIMIZE PRODUCTION
This reservoir exploitation strategy should address reducing exploitation time due to economic, regulatory or strategic reasons. The ideal application for IWS completions is for producing at the same time from different formations with different reservoir characteristics (petrophysical or fluids) or different energy levels (pressure). The variable to be controlled for optimizing flow of fluids is the bottomhole flowing pressure per zone (PWF).
IWS completions can be used for controlling different formations or reservoirs at the same time, maximizing production per zone, and reducing risks associated with cross flow or differential depletion. As a result of this control strategy, production is optimized (optimal production profiles) and the recovery is accelerated. Gauges installed per zone monitor the PWF and let engineering personnel (in charge of making key decisions) interpret specific tendencies for making the right decisions.
REDUCE INTERVENTION COSTS
IWS completions are designed to last for the life of the well. The design for each well is made to afford most of the possible operational situations that could happen in any period of the field life (e.g., water or gas channeling, differential depletion, production or injection profile issues). Obviously, the gauges installed provide real-time data per zone that is used for reducing uncertainties, optimizing production or injection, and making proactive rather than reactive decisions.
Reducing intervention in deepwater wells is important because of the high costs involved. In that sense, many operators would choose higher initial investment if it reduces future operational costs and risks associated with intervention due to problems they did not initially expect. However, if an intervention becomes imperative after the intelligent well system completion is installed (e.g., for correcting a problem associated with productivity), the IWS completion offers the flexibility of diversion.
MINIMIZE ENVIRONMENTAL IMPACT
Buildup tests, workovers and running production logs are well interventions. In all these cases, the risk of generating an environmental impact is always there in traditional well completions.
If the IWS completion installed has gauges for monitoring well behavior and for interpreting reservoir exploitation strategy, chemical injection systems for reducing risk associated with plugs, and trained personnel monitoring the data received through signals these systems generate, then the risks of proceeding with well intervention would be very low because of the decisions associated with reservoir exploitation strategies will be proactive (prevention) instead of reactive (corrections).
Figure 1 shows the typical process service company technical personnel follow for selecting the appropriate design during an IWS analysis. The first part of the process (colored) is associated with reservoir and production analysis. The second part of the process (not colored) shown in Fig. 1 is the IWS completion, economics proposal, manufacturing process, quality control, HS&E procedures and field execution.
    
Fig. 1. Flow diagram for selecting, installing and managing an IWS completion. 
Reservoir and production analyses are performed to determine the IWS completion configuration, control philosophy, control levels, gauge specifications, chemical injection needs, new production behavior and possible new recovery factor; taking into account the information provided by the customer.
Nodal analysis is an important tool for determining initial production condition (total or per zone). Additionally, this analysis helps in configuring the control valve adjustable internal positions (mechanical configuration) and for determining the additional production that would be obtained with this application. However, this information is only one snapshot (the solution in a specific moment during the life of the well).
Currently, service company technical personnel perform near-wellbore analysis using reservoir simulators, with the objective of estimating the future behavior of the well considering the current or new exploitation strategy. In addition to initial production, it is now possible to predict possible scenarios associated with reservoir exploitation, with the objective of designing the IWS completion for most of the operational conditions that would be occur during the exploitation life of the reservoirs.
IWS APPLICATIONS
In general, IWS completions are well suited for these applications: commingled production, correction of production or injection profiles issues, deepwater wells and dump-flood strategies.
COMMINGLED PRODUCTION
Some fields have two or more reservoirs that could be produced at the same time (usually at different depths). However, these reservoirs could have different petrophysical properties, fluid characteristics and/or different pressures. Using an IWS completion lets the operator simultaneously produce from these reservoirs, reducing risks related to cross flow and differential depletion. An IWS completion accelerates production by taking advantage of real-time monitoring and active control. Figure 2 shows a possible reservoir example for this application.
   
Fig. 2. Commingled production from three reservoirs. 
INJECTION PROFILE ISSUES
For a number of reasons, many oil and gas reserves have been bypassed during the reservoir exploitation process. One reason is that reservoirs can be subdivided (in many cases) by some fluids units inside the same reservoir with different petrophysical properties. In many cases, no vertical communication between these flow units exists. Additionally, these flow units can have different volumes. Figure 3 shows an example of injection and production profile issues. As a result of this normal characteristic of reservoirs, differential depletion occurs (some flow units deplete faster than others) during the production process or differential replacement occurs (some fluids units build up their pressure faster than others), when injecting fluids for pressure support.
   
Fig. 3. Reservoir with different flow units and injection profile problems. 
Traditional solutions can be tried to correct or to avoid these issues (e.g., mechanical or chemical blocking, selective completions, density control during perforating), but most of the time these techniques will not provide a permanent solution because reservoir conditions are changing permanently as consequence of exploitation. In this sense, IWS completions (active control) are the best solution for this typical problem. The idea is to produce or inject (through active control valves) the fluids that each flow unit has the capacity for or requires, according to its petrophysical properties or energy levels. Figure 4 shows movement of fluids from injector wells to a producer well in a scenario of no uniform injection (injection profile issues).
For this example, it can be observed that the fluid injected through flow unit number four (injector well) will arrive faster to the producer well compared with other fluids units. Once this happens, it will be very difficult to recover the reserves associated with the other fluid units (1, 2, 3 and 5).
Figure 4 shows the same behavior as in Fig. 3. However, in this case a reservoir simulator was used to understand better the behavior at the reservoir level. For this analysis, one producer and four injector wells were used (with the same number of fluid units previously discussed).
It can be observed that through Zone 4 (Fig. 3) the water will arrive first from the injector well to the producer well. This means that a good part of the reserves would be bypassed if control actions in injector wells are not taken (this is the kind of problem operators try to avoid daily). Figure 4 confirms the information interpreted in Fig. 3.
    
Fig. 4. Simulation of channeling process of one specific flow unit. IWS completions can avoid or correct problems like this. 
OFFSHORE AND DEEPWATER WELLS
One of the most complex and challenging applications for IWS completions is offshore, especially deepwater. The obvious aspects of the complexity are high-pressure high-temperature, extreme deep conditions, high levels of uncertainties associated with geological and reservoir aspects, etc. Additional challenges are: high drilling costs, high workover costs, high costs of surface and marine facilities and environmental regulations.
Uncertainty levels associated with exploitation are higher compared to traditional land reservoirs, especially because interventions are not economical. Well completions are designed to accommodate most of the possible contingencies. For this reason, IWS completions are frequently installed in this kind of well. This includes the most sophisticated real-time monitoring systems and control valves with maximum flexibility (choking capability) for making the right decisions at the right time.
One of the most important objectives of offshore/deepwater exploitation strategies is to minimize the number of wells to be drilled, while maximizing final recovery of reserves. For this, well architecture (vertical, highly deviated, horizontal, multilateral, etc.) is fundamental, and for all these cases IWS completions are an ideal solution.
DUMP FLOOD STRATEGIES
Enhanced Oil Recovery (EOR) strategies are among the most complex and successful methods for maximizing final recovery of reserves. Surface facilities, operations and logistics associated with EOR operations are very expensive, especially if they are used in offshore or in deepwater projects. Reducing costs in these projects is highly desirable.
In some fields, an aquifer or gas cap with enough energy and reserves (water or gas) could be used for providing fluids with enough energy for injecting directly into some reservoirs or formations. This strategy takes advantage of a natural deposition and migration process that occurred in the past and is now available in the field during exploitation. The idea is to install an IWS completion, proceed to produce a specific fluid with energy (water or gas), and injecting that fluid in a specific volume on each reservoir that requires it for maintaining the replacement factor in the values specified by the exploitation strategy, before that fluid arrives at surface. Obviously, adjustable control valves are the key factor for optimizing the replacement factor and, as consequence, the recovery factor of the field.
Figure 4 shows an example of a dump flood. The different petrophysical properties and energy values of the reservoirs (different green colors) and of the aquifer (blue color) can be seen. Additionally, Fig. 5 shows the possible mechanical configuration of the IWS completion for this well. In this case, the control valves (yellow color) are adjustable for controlling the water volume to be injected into each reservoir.
   
Fig. 5. Dump flood example. Aquifer is used for injection into other formations. 
CONTROL PHILOSOPHY
A normal selective completion using sliding sleeves (mechanically activated), with packers between different zones, was once the most sophisticated system for trying to control commingled production. Obviously, these systems required wireline or coiled tubing for activation. The advantages and disadvantages of these mechanical systems are:
Advantages       
?                                 Low cost of sliding sleeve             
?                                 Low cost of packers     
?                                 Can exploit more than one zone simultaneously       
Disadvantages
?                                 Choking does not control flow from different zones
?                                 Cross flow cannot be controlled
?                                 Problems in a zone often require shutting off the zone
?                                 Production or injection problems cannot be corrected
?                                 Wireline operations increase the risk of fishing
?                                 Reservoir cannot be monitored in real time
?                                 Possibility of deferred production
?                                 Possibility of environmental impacts
Electrical and hydraulic are the two methods of bottomhole control. Hydraulically actuated systems are the most popular control systems in current use.
HYDRAULIC ACTIVATED SYSTEM, TWO POSITIONS (ON-OFF)
This system requires control lines installed with the completion for activation and feed-thru packers for isolation. The most important advantages and disadvantages are:
Advantages       
?                                 Multiple formations can be produced simultaneously
?                                 Multiple formations can be monitored in real time
?                                 Control valves can be activated remotely    
?                                 Well test can be performed without intervention     
?                                 Does not require maintenance   
Disadvantages
?                                 Completion cost is higher than mechanical systems
?                                 Flow from different zones cannot be choked
?                                 Cross flow cannot be controlled
?                                 Problems in a zone often require shutting off the zone
?                                 Production or injection profile problems cannot be corrected
It can be observed that these systems have more advantages than mechanically activated systems, but they have some disadvantages that are crucial from a reservoir strategy point of view. However, some applications would require these specific control philosophy equipments.
HYDRAULIC ACTIVATED SYSTEM, MULTIPLE POSITIONS (CHOKING CAPABILITY)
These systems require control lines installed with the completion for activation and feed-thru packers for isolation. The most important advantages and disadvantages are:
Advantages       
?                                 Total control of production or injection profiles      
?                                 No cross flow between different zones
?                                 Real-time monitoring of different zones (producing or injecting
?                                 Control valves can be activated remotely
?                                 Well test can be performed without intervention
?                                 Operations associated with production or injection optimization can be performed online (closed loop)
?                                 Does not require maintenance
Disadvantages
?                                 Completion cost is higher than mechanical systems
It is obvious that IWS completions with choke capability have more advantages and fewer disadvantages. They offer the maximum control of most of the possible operational conditions that could happen during the lifecycle of the well.
IWS completions offer flexibility and reliability, but the most important aspect of this technology is its ability to adapt to changing well conditions, whether these changes are part of a planned reservoir exploitation strategy or an unplanned event.
Finally, it is important to note that each IWS completion application is different, and control requirements could vary from one application to other. But in general, IWS completions with choke capability will increase the possibility of higher reserves recovery compared to traditional completions (no control), mechanically activated systems, on-off systems, or any other control technology including passive control completion systems such as inflow control devices.
Detailed analysis, evaluation, and simulation must be performed to determine the correct approach to an IWS completion to get the greatest value from this technology. An IWS completion is the key component of an exploitation strategy to maximize final recovery of reserves through maximum control, real time monitoring and closed loop capability. IWS completions can help operators make the right decision at the right time by reducing uncertainty levels.  

楊寶劍 是振威(全球)石油網(wǎng)的高級(jí)技術(shù)編輯,在石油技術(shù)資訊行業(yè)有八年的學(xué)識(shí)和經(jīng)驗(yàn)。他源源不斷地提供石油行業(yè)全球最新的技術(shù)創(chuàng)新、研發(fā)成果、現(xiàn)場(chǎng)應(yīng)用情況等信息。如果你對(duì)該項(xiàng)新技術(shù)有任何的疑問(wèn),或者對(duì)“新技術(shù)新產(chǎn)品”未來(lái)的內(nèi)容有任何問(wèn)題或建議,請(qǐng)聯(lián)系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎與行業(yè)互動(dòng)!


          您的分享是我們前進(jìn)最大的動(dòng)力,謝謝!
關(guān)鍵字: 智能井 完井 
關(guān)于我們 | 會(huì)員服務(wù) | 電子樣本 | 郵件營(yíng)銷 | 網(wǎng)站地圖 | 誠(chéng)聘英才 | 意見(jiàn)反饋
Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有
京ICP證120803號(hào) 京ICP備05086866號(hào)-8 京公網(wǎng)安備110105018350
精品国产一区探花在线观看| h片视频在线观看| 欧美老肥妇做.爰bbww| 日本丰满少妇做爰爽爽| 国产麻豆成人传媒免费观看| 亚洲欧美日韩色| 香蕉综合视频| 国产精品av免费| julia一区二区三区中文字幕| 91精品在线观看视频| 日韩一区av| 久久精品国产亚洲| 春意影院免费入口| 日韩欧美专区在线| 原谅我中文字幕| 欧美日韩国产精品一区二区三区四区 | 超碰在线播放97| 亚洲欧洲精品一区二区三区不卡| 久久午夜无码鲁丝片午夜精品| 国产乱人伦精品一区二区在线观看 | 久久久久久久穴| 欧美精品播放| 成人一区二区三| 尤物tv在线精品| 成人在线免费高清视频| 国产美女亚洲精品7777| 欧美日韩精品免费观看视一区二区 | 992tv在线观看| 亚洲九九九在线观看| 国产91色蝌蚪视频| 欧美日韩成人综合天天影院| 亚洲图片欧美日韩| 久久亚洲影视婷婷| 久久艹精品视频| 国产精品一区三区| 亚洲日本中文字幕| 久热中文在线| 欧美日韩在线观看视频| 91精品国自产| 国产精品久久久久国产精品日日| 在线免费观看你懂的| 亚洲一区二区三区视频在线播放| 偷偷操不一样的久久| 不卡视频在线观看| 欧美日韩色视频| 国产综合成人久久大片91| 亚洲国产精品成人综合久久久| 亚洲国产日韩欧美一区二区三区| 手机视频在线观看| 色一区二区三区四区| www.四虎成人| 久久密一区二区三区| 成年人在线观看视频免费| 日韩欧美三级| 一区二区三区韩国| 中文字幕一区二区精品区| 亚洲综合日韩欧美| 免费不卡欧美自拍视频| 偷拍国模大尺度视频在线播放| 欧美一二三在线| 91小仙女jk白丝袜呻吟| 精品国产凹凸成av人网站| 午夜一级电影| 亚洲人成毛片在线播放| 男女羞羞电影免费观看| 日韩视频免费在线| 黄污在线观看| 9.1国产丝袜在线观看| 高h视频在线| 国产精品爽爽ⅴa在线观看| 日本孕妇大胆孕交无码| 高清一区二区三区视频| 久久夜夜操妹子| 99国产精品久久久久久久久久久| 日本三区在线观看| 99久久婷婷| 日日夜夜精品视频免费观看| 日韩午夜激情| 国产成人精品无码免费看夜聊软件| 久久91精品国产91久久小草| 在线视频这里只有精品| av毛片久久久久**hd| 久久久久久久久久久影院| 中文字幕一区二区在线播放| 国产99对白在线播放| 在线看日本不卡| 国产69精品久久久久9999小说| 亚洲国产欧美久久| 7878视频在线观看| 欧美激情亚洲激情| 香蕉视频免费在线播放| 5g影院天天爽成人免费下载| 欧美成a人片在线观看久| 宅男一区二区三区| 你懂的视频欧美| 日本黄色福利视频| 日韩高清国产一区在线| 午夜精品福利在线视频| 国产欧美精品一区二区色综合 | igao视频网在线视频| 欧美一二三视频| 欧洲精品二区| 日本精品一区二区三区高清 久久| 97精品久久| 韩国中文字幕av| 美女被久久久| 国产精品第二页| 黄网站免费观看| 5278欧美一区二区三区| 美女网站视频在线| 日韩欧美三级电影| 蜜桃精品噜噜噜成人av| 一级黄色免费毛片| 精一区二区三区| 国产精品第5页| 欧美性猛交视频| 影音先锋2020资源| 久久精品亚洲国产| 免费高清在线观看| 蜜桃视频日韩| 精品在线观看入口| 一级黄色电影片| 成人爱爱电影网址| a天堂中文在线观看| 91精品国产免费久久综合| 三上悠亚在线资源| 国产91色在线播放| 欧美日韩不卡| 久久国产亚洲精品无码| 国产一区二区三区久久| 欧美成人免费观看视频| 亚洲黄网站在线观看| 欧美色图色就是色| 日韩一区av在线| 97超碰在线公开在线看免费| 日韩精品大片| 久久国产中文字幕| 美女洗澡无遮挡| 欧美激情在线一区二区三区| 亚洲综合天堂网| 国产一区二区三区精品久久久| 成年人在线视频| 欧美在线日韩精品| 色欧美自拍视频| 国产成人va亚洲电影| 久久综合中文字幕| 国产不卡av在线播放| 91精品国产高清一区二区三区蜜臀 | 9久久婷婷国产综合精品性色| 日韩激情视频在线观看| 国产 日韩 欧美 在线| 欧美性猛交xxxx乱大交| 天天操夜夜操天天射| 国产成人久久久精品一区| 成人国产激情| 网站一区二区三区| 国产美女av一区二区三区| 91片黄在线观看喷潮| 精品国产在天天线2019| 色av男人的天堂免费在线| 久久99精品久久久久久三级| 欧美精品尤物在线观看| 免费看污片的网站| 国产精品久久久久久久久免费樱桃| 日韩黄色成人| 欧美国产在线视频| 婷婷午夜社区一区| 免费在线观看的毛片| 国产精品一区免费在线观看| av中文在线观看| 国产午夜精品美女视频明星a级| 久久精品视频观看| 97超碰免费观看| 好操啊在线观看免费视频| 精品久久久久久亚洲综合网 | 好吊操这里只有精品| 在线看日韩精品电影| 日本中文字幕电影| 国产精品免费视频一区二区| 国产乱码精品一区二区三区四区| 亚洲一级中文字幕| 一区二区高清免费观看影视大全| 视频在线你懂的| 日韩av不卡电影| 成人福利一区| xxxx日本免费| 亚洲v中文字幕| 国产三级免费观看| 国产一区喷水| 亚洲精品成人无限看| 日本一区二区不卡在线| 欧美高清性hdvideosex| 黄色av网址在线免费观看| 一区二区免费电影| 久久九九电影| 99国产揄拍国产精品| 中文字幕精品一区二区精品| 日本在线影院| 九九九九九国产| 国产欧美一区二区三区网站|