九九久久久久99精品_日韩一区二区在线免费观看_综合国产第二页_精品免费二区三区三区高中清不卡

導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

Understanding MPD complexity levels

[加入收藏][字號: ] [時間:2008-12-31 E&P 關注度:0]
摘要:Understanding MPD complexity levels Determining the complexity of a managed-pressure drilling project can identify wh...
Understanding MPD complexity levels

Determining the complexity of a managed-pressure drilling project can identify which tools to use to get it right the first time.


Weatherford’s ECD reduction tool.

As managed pressure drilling (MPD) continues to evolve alongside its associated tools and measurement equipment, drillers are realizing that various formations and pressure regimes may require additional screening during the MPD planning process. In some scenarios, certain MPD tools might be unnecessary, creating significant cost overruns.

Conversely, some formations may require additional MPD components for added precision, or the application runs the risk of failure because of unmitigated problems.

Selecting the appropriate method of MPD ? constant bottomhole pressure (CBHP), dual gradient, pressurized mudcap (PMCD), or HSE MPD ? is crucial for project success, but variation alone might not adequately set all required parameters. Drillers must also thoroughly understand the level of complexity their drilling project constitutes and then select the proper tools and procedures ? no more, no less ? in order to effectively implement MPD.

Basic MPD

Complexity Level 1. The most elementary level of MPD complexity is all that is required when the operational pressure window is relatively wide and the goal is increased safety. Basic MPD uses only a rotating control device (RCD) and interconnecting piping for directing returns flow.

Applicable areas include regions where high rock strength and low permeability yield low rate of penetration (ROP). ROP increases, ranging from linear to exponential, result from decreased drilling fluid density across such formations.

Accepting lower kick and trip tolerances during MPD applications is necessary along with a lower margin between actual mud weight and pore pressure equivalent. Constant annulus pressure monitoring is typically unnecessary since there is no pressure maintained under the RCD, and the annulus is continually isolated from the rig floor for increased safety. In the event of a kick, the rig floor is not exposed to any flow or hazardous gases while the BOP stack is being activated. Conventional well control methods are typically used to circulate out the kick.

Enhanced kick/loss detection

Complexity Level 2. The next level on the MPD complexity scale is possible due to recent adaptations in flow measurement technology and equipment.
To offset risks involved with decreased margin between pore pressure and mud weight, MPD service companies have introduced “returns flow monitoring” into their product and service lines, either as an optional service or integral to their systems. Adding a flow meter on the return flow provides enhanced (early) kick and loss detection as well as the ability to determine whether flow anomalies are truly kicks/losses or some other phenomena.

Today’s flow meters are durable enough to handle the large volumetric flow seen during drilling and can withstand the presence of solids in the flow stream.

Manual choke MPD

Complexity Level 3. In conventional drilling, wellbore pressure is primarily adjusted by lowering or raising mud weight. Frictional pressure losses can vary significantly depending on circulation rate, mud rheology, and wellbore geometry.

The third complexity level, “Manual MPD,” uses a flow choke on the returns flow path as an additional control point and can be used with or without enhanced kick/loss detection. This provides an easily controlled variable: applied pressure from the choke, or surface backpressure. The annular pressure is described as:

BHCP = P(mw) + AFP + SBP

Where:
• BHCP is bottomhole circulating pressure;
• P(mw) is hydrostatic pressure of the drilling mud;
• AFP is annular friction pressure; and
• SBP is surface backpressure.

During conventional drilling, hydrostatic mud weight must remain above pore pressure equivalent (to avoid an influx) and collapse pressure (to avoid wellbore failure) while remaining below fracture pressure of the open wellbore.

While drilling, manual MPD replaces some of the hydrostatic pressure exerted by mud weight with friction pressure to maintain control of the well without losing returns. The objective is to maintain wellbore pressure between the highest pore pressure and the weakest fracture pressure. This is often accomplished by drilling with a hydrostatic gradient less than what is required to balance the highest pore pressure, with the difference made up using dynamic friction while circulating and SBP while static during connections and trips.

The challenge is maintaining near-constant annular pressure while transitioning between circulating and shut-in to maintain balance. Manual MPD traps pressure at the surface by gradually closing the choke on the returns flow path (until completely closed) while simultaneously reducing the circulation rate to zero (until pump speed is slowed to a stop).

Figure 1 shows an example stepwise SBP and pump rate graph for use when shutting down or bringing up the pumps on a connection. SBP should increase as the circulating rate (pump speed) decreases for a particular situation. To avoid influx, the annular pressure should always exceed the required calculated
pressure.

Automated choke MPD

Complexity Level 4. Differential sticking tendency, wellbore breathing or ballooning, pore pressure regression (depletion), and wellbore instability can demand fine control of the annulus pressure profile based on actual drilling conditions. Pre-drill models generated to predict conditions are verified and updated during MPD with actual measurements. Any differences are analyzed and acted upon as potential problems are identified.

The next MPD complexity level uses an automated control system to manage SBP. Control software uses various data to automatically operate the choke manifold to maintain a computed choke set point. The software communicates with the choke’s programmable logic controller (PLC), which controls a mechanical device that adjusts the choke.

More complex systems monitor, predict, and maintain annular pressure using hydraulics modeling software, automated chokes, and continuous surface circulating systems, sometimes working in conjunction with one another. These systems require specially trained operators.

For basic automation, the operator enters the desired SBP, and the computer and PLC maintain the desired pressure with choke position. As the allowable pressure window decreases, real-time hydraulic simulators can be employed. The simulator makes adjustments as pressure windows are recalculated from actual wellbore and surface measurements and then passes the resultant information to the choke control algorithm.

MPD with enhancements

Complexity Level 5. Recently introduced equipment systems and processes enhance MPD by providing a higher level of predicting, monitoring, and controlling annular pressure, minimizing problem issues and down time. Whereas manual MPD uses trapped SBP to maintain constant bottomhole pressure, enhanced MPD techniques typically use dynamic means to control wellbore pressure.

One way to maintain annular pressure is to use the continuous circulation system (CCS) developed by National Oilwell Varco subsidiary Shaffer. The CCS allows uninterrupted circulation through the wellbore while making connections, alleviating positive and negative pressure surges experienced when drilling conventionally.

The tool enables drilling into narrow pore pressure/fracture gradient windows and can reduce stuck pipe incidents. Ballooning effects are also minimized, as is the likelihood of formation influx. Cuttings transport and removal are also improved.

Another cutting-edge MPD technology is Weatherford’s ECD reduction tool (Figure 2), reportedly in the final stages of field trials, according to Don Hannegan, pressure control strategic manager at Weatherford. The tool, developed in collaboration with BP, is a turbine pump downhole tool that produces a “pressure boost” to the return fluid in the annulus, achieving a dual gradient in the annulus return. It is designed to counter downhole pressure increases caused by friction in the annulus by reducing the equivalent mud weight.

The ECD reduction tool is expected to have application in deepwater drilling (where drillers are historically forced to run several casing strings to reach target depth, therefore progressively reducing the hole size) and extended-reach wells (where the length of the well increases frictional pressure loss, thereby increasing ECD and causing fracturing and/or mud loss).

Planning for success

Selecting the correct MPD variation is paramount, but may not offer all the answers. “Overdoing” or “underdoing” MPD can cause cost overruns or project failure, leading operators to believe MPD failed.

Understanding and applying the proper MPD complexity level can prevent misinterpretations and provide a blueprint for successful MPD.

關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
亚洲精品乱码久久久久久蜜桃图片| 在线观看国产一级片| 福利影院在线看| 91tv亚洲精品香蕉国产一区7ujn| 97秋霞电影网| 亚洲国产美女精品久久久久∴| 成人久久在线| 五月激情六月综合| 日韩一区免费| 中文字幕乱码中文字幕| 中文有码一区| 日韩影院一区| 成人动漫一区| 久久亚洲精精品中文字幕早川悠里| 国产精品视频黄色| 少妇精品导航| 特级黄色录像片| 日韩黄色在线| 加勒比在线一区二区三区观看| www在线观看播放免费视频日本| 97国产suv精品一区二区62| 九色在线91| 日韩精品免费视频| 初体验·韩国| 在线电影欧美成精品| 男女猛烈无遮挡午夜视频| 午夜精品久久久久久久蜜桃app| 又污又黄的网站| 欧美激情中文不卡| 国偷自拍第113页| 99精品国产99久久久久久白柏| 中国一级片在线观看| 国内精品伊人久久久久av影院 | 久久aimee| 中文字幕欧美日韩一区二区三区| 国产一区二区主播在线| 国产一区二区不卡视频| 国产欧洲在线| 动漫3d精品一区二区三区| 里番在线播放| 91欧美精品午夜性色福利在线 | 老**午夜毛片一区二区三区| 日韩女优在线视频| 99精品国产在热久久| 中文写幕一区二区三区免费观成熟| 伊人久久大香线| 手机av在线免费| 欧美午夜不卡| 又黄又爽又色的视频| 亚洲香蕉网站| 熟女人妻一区二区三区免费看| 亚洲精品护士| 日本少妇xxxx| 日韩综合一区二区| xxx在线播放| 激情综合色综合久久| 亚洲自拍偷拍图| 久久狠狠亚洲综合| 日本一二三不卡视频| 精品系列免费在线观看| 欧美日韩国产黄色| 国产丶欧美丶日本不卡视频| www欧美com| 92精品国产成人观看免费| 国产成年人免费视频| 久久久久久一二三区| 国产一级淫片a视频免费观看| 国产精品午夜电影| 中国老头性行为xxxx| 伊人色综合久久天天人手人婷| 99国产精品久久久久久久成人| 亚洲在线一区二区三区| 亚洲免费国产视频| 色偷偷久久一区二区三区| 亚洲人视频在线观看| 欧美日韩一级片网站| 国产青草视频在线观看视频| 亚洲国产中文字幕久久网| 天天操夜夜做| 久久亚洲影音av资源网| 污黄网站在线观看| 国产69久久精品成人| 成人黄色在线电影| 国产91一区二区三区| 97精品国产99久久久久久免费| 天堂精品一区二区三区| 97视频一区| 国产成人无码精品久久久性色| 亚洲男女av一区二区| 69亚洲乱人伦| 极品尤物av久久免费看| avtt天堂在线| 国产精品国产精品国产专区不蜜| 国产ts人妖调教重口男| 91成人免费网站| 中国女人一级毛片| 中文字幕久热精品视频在线| 亚洲一区二区三区成人| 国产精品1区2区在线观看| 91白丝在线| 日韩精品大片| 人体久久天天| 天天干天天玩天天操| 丝袜美腿高跟呻吟高潮一区| www色aa色aawww| 国产精品视频九色porn| 亚洲精品字幕在线| 日韩一区二区三区观看| 成人免费视频网站在线看| 久久久爽爽爽美女图片| 在线不卡日本v二区707| 精品无码久久久久久久动漫| 视频精品国内| 精品久久久久久久无码| 六月天综合网| www.av视频| 亚洲同性同志一二三专区| 亚洲精品97久久中文字幕| 日韩一区二区免费在线观看| 国产视频青青| 国产精品视频26uuu| 国产69精品久久久久按摩| 天天夜碰日日摸日日澡性色av| 狠狠色狠狠色综合日日tαg| 任你操精品视频| 中文字幕欧美激情一区| 污污网站在线免费观看| 亚洲国产古装精品网站| 水蜜桃免费高清视频在线播放| 久久成人国产精品| 97影院秋霞午夜在线观看| 日韩三级电影网站| 久久国产电影| 成人免费无遮挡无码黄漫视频| 久久久久久久电影| 天天干天天爽天天操| 精品国产免费一区二区三区香蕉| 动漫黄在线观看| 在线精品一区二区| 国产熟女一区二区| 欧美国产一区二区在线观看| 国产又爽又黄网站亚洲视频123| 国产视频精品xxxx| av地址在线观看| 亚洲专区一区| 国产精品自拍视频一区| 欧美性xxxx极品高清hd直播| 黄色动漫网站| 国产v综合ⅴ日韩v欧美大片| 国产亚洲人成a在线v网站 | 欧美aaa在线观看| 狠狠色丁香久久综合频道| 精品99在线观看| 欧美视频在线观看免费| av播放官网| 国产欧亚日韩视频| 欧美电影免费网站| 欧美成人三级伦在线观看| 中文字幕免费不卡| 国产欧美日本亚洲精品一4区| 久久久女女女女999久久| 成人自拍视频网| 久久婷婷国产91天堂综合精品| 国产在线乱码一区二区三区| 国产麻豆一精品一男同| 亚洲国内精品在线| 欧美人xxx| 男女裸体影院高潮| 丝袜亚洲另类欧美综合| 在线观看亚洲黄色| 91精品福利在线一区二区三区 | 欧美亚洲爱爱另类综合| 91日韩视频| 欧美三级 欧美一级| 日本丶国产丶欧美色综合| 黄色资源在线看| 国产一区二区三区高清| 日韩欧美视频| 欧美一区二区三区爽爽爽| 色综合天天性综合| 500福利第一精品导航| 精品视频第一区| 中文无码久久精品| 亚洲 欧美 视频| 日韩欧美一级片| 日本a在线播放| 国内自拍中文字幕| 免费欧美在线视频| 亚洲av综合色区无码一二三区| 色妞色视频一区二区三区四区| 在线观看特色大片免费视频| 91极品尤物在线播放国产| 99re成人精品视频| 韩国三级午夜理伦三级三| 欧美一区第一页| 激情av综合| 国产又粗又猛又爽又黄的视频小说| 大荫蒂欧美视频另类xxxx| 97影院在线观看| 天天综合色天天综合色hd|