First conceived as alternatives to costly or technically difficult interventions, intelligent wells that can be monitored and controlled remotely have evolved into a powerful reservoir management tool. As a result, after initially slow industry-wide uptake, their number is projected to increase fivefold in the next five years. 


At the heart of intelligent wells are surface-actuated downhole valves, used to regulate flow from individual zones or laterals, and permanent downhole temperature and pressure sensors. Today, downhole control valves range from those with simple on-off controls to hydraulically actuated and electrically controlled, infinitely variable-setting chokes. These innovations permit engineers to design valves that can be remotely adjusted within a range of cross-sectional flow areas matched to a zone’s production profile. Schlumberger now reports a 97% reliability rate for its second-generation valves.

While the initial objective of intelligent well technology?extending well life?was effective, that was not the most efficient use of the technology. Instead, the technology’s true promise, the industry has come to understand, is best realized when intelligent wells are used as a tool for maximizing reserves recovery. This change in intelligent well identity ? from intervention avoidance to reservoir management tool ? has been greatly enhanced by the emergence of robust downhole permanent pressure and temperature sensors capable of functioning in harsh environments for extended periods of time. Their new role has also been furthered by increased longevity, the result of more reliable electrical connections that in the past had been a weak link in downhole electronics. Today, fully redundant, independently testable, mechanical and full-welded connectors and splices have delivered a step-change improvement in reliability.

Because of these new technologies, monitoring today includes much more than pressure and temperature data. Permanent downhole multiphase flowmeters, seismic sensors, and electrodes have been included to deliver formation imaging away from the well bore, and they are all being connected through control centers that facilitate almost instantaneous responses to changing conditions. Data from these intelligent completions are also used to continually enhance and update production models and simulations, perform and interpret production tests on individual zones and laterals, predict sand and water encroachment, and measure flow rate and water cut.

Smart choice

The advantages of reservoir monitoring and control are obvious. For example, since wells seldom cross only a single hydrocarbon-bearing zone, completion engineers are often forced to decide between commingling production from multiple zones and producing each zone sequentially. Historically, producing more than one zone at a time has been an option only when the zones are of compatible pressure and fluid composition, and no regulatory concerns exist. Two, three, and sometimes four perforated intervals also can be produced at the same time through completions in which each zone is mechanically isolated from the others and flowed to the surface through separate production strings.

Sequential production typically requires flowing one zone to its economic limit before plugging and abandoning it in order to move up the hole to complete the next zone.

This cycle is then repeated until all zones have been depleted. In almost all cases, this strategy leaves behind considerable reserves and results in poor production profiles because of extended periods of depletion within each zone.

In contrast, using intelligent completions in a sequential production scheme, which involves opening and closing each zone remotely from the surface, improves production by eliminating both intervention costs and poor production profiles. Variable-setting valves can also be used to eliminate sequential production in favor of commingling by managing flow from high-pressure zones to prevent crossflow.

This does not mean that intelligent completion technology guarantees added value wherever it is applied. Experience has shown that the degree to which production is improved by intelligent completions depends on such factors as porosity and permeability distribution within that reservoir. The decision to use intelligent wells does not require every well in a smart field to be an intelligent completion. The operator must first ascertain that the reservoir type in a given field is suitable for intelligent well technology and then make a similar determination for each well planned for the field.

Candidate screening processes range from a simple analytical approach to complex reservoir models. Given such inherent uncertainties as reservoir characteristics, produced fluid composition, well performance, and recovery efficiency, it is important to use a stochastic rather than deterministic approach in the screening process.

Guiding parameters

General experience-based guides for choosing an intelligent well strategy have emerged over time. In a reservoir with uniform permeability, for instance, remotely actuated valves would seem, at first glance, to be an effective tool for managing water influx and therefore increasing well life and ultimate recovery. But if the completion is to be set across a relatively short interval within that reservoir, an intelligent completion may not be economically justified since a sufficiently uneven fluid front may not develop. In other words, the oil and water streams may not be sufficiently distinct to allow control of one fluid flow stream without affecting the other, and an intelligent completion would be a waste of money.

While intelligent completions can be effective in layered reservoirs, for obvious reasons they are decidedly more efficient when the shale zone separating the sands is continuous and the seal impermeable. Therefore, within the same layered reservoir, some wells crossing reliably sealed layers are well-served by intelligent completions.

One set of mathematical models developed for candidate screening uses reservoir simulation and well simulation techniques to generate a comparative model of the benefits of intelligent completions. Scenarios are created to generate variance in reservoir performance affecting the timing of events requiring intervention, reservoir monitoring, or reservoir management and are often driven by geological uncertainty and reservoir heterogeneity.

In heterogeneous channel reservoirs, the benefits of intelligent completions depend on well performance, which, in turn, depends on well placement with respect to the permeability of the formation and connectivity of the channels. That is because the effectiveness of flow control valves depends on choking, which is a function of high deliverability. By their nature, however, the majority of heterogeneous reservoirs benefit from intelligent completions since their varying permeability and porosity tend to create just the kind of fluid front that variable-setting valves can best exploit.

Team effort in Saudi Arabia

In 2004, Saudi Aramco engineers drilled and completed a maximum reservoir contact (MRC) well as a proof-of-concept project. The well is in the Haradh field, the designation given the southwest portion of Saudi Arabia’s giant Ghawar field. The Haradh area was brought on production in three successive increments over nearly 10 years from May 1996 to January 2006. While Increment I was developed using conventional completions wells, experience led Saudi Aramco engineers to eventually include MRC, multi-laterals, and intelligent completions in final Increments II and III.

The A12 well in the Haradh area was originally completed from a horizontally set, 7-in. line. A 61⁄2-in. horizontal openhole section was then drilled from the bottom of the liner and a 41⁄2-in. liner set across a section that had incurred heavy fluid losses during drilling of the main well bore. Two more 61⁄2-in. laterals were drilled from the 7-in. liner and left as “barefoot,” or openhole, completions.

With this standard multilateral completion, no water was produced initially, but in less than one year, water cut had reached about 23%. As a result, available drawdown and overall production were reduced and treatment and disposal costs rose, prompting the operator to deem water-production control imperative.

In response, Schlumberger designed and deployed an intelligent completion system with multiposition, downhole flow control valves and surface flow-rate measurements to selectively manage water production from each of the three zones. Through optimization of the downhole control valves, water cut was reduced from 23% to almost zero.

The successful application of intelligent wells to the Haradh field, as detailed in a paper presented at the 2007 International Petroleum Technology Conference, held in Dubai, was the result of a project-management approach to the design, planning and installation processes. Five Schlumberger segments teamed with the Saudi Aramco facilities, production, drilling and workover; reservoir management; and reservoir description departments. Schlumberger and Saudi Aramco’s reservoir management and reservoir description departments built a multilateral well model in PIPESEM production system analysis software to calculate pressures opposite each lateral at various water cuts. The simulation estimated lateral performance across the valves over a range of pressure and flow rates.

Prior to starting the project, more than 30 multidisciplinary team members from Schlumberger and Saudi Aramco participated in a two-day forum to plan the project, run the completion on paper, agree on the design criteria and running procedures, and define responsibilities. Participants jointly developed a list of 28 action items in an effort to ensure a trouble-free operation.

The field team consisted of a completions installation crew, a reservoir evaluation wireline crew, a coiled tubing crew, and a multiphase flow testing crew managed through the Schlumberger advanced completions project manager. In view of the well’s workover history and the possible presence of casing deformations capable of affecting intelligent completion installation, the reservoir evaluation wireline and well services segments ran a USI UltraSonic Imager corrosion log on coiled tubing. The run confirmed the integrity of the casing and the suitability of QUANTUM gravel pack and MultiPort bypass packers with multiple porting. Using a PhaseTester portable multiphase well production monitoring system and the InterACT real-time monitoring and data delivery system, the team optimized the intelligent completion performance. This enabled the

Saudi Aramco engineers at their offices in town to adjust downhole flow-control valve settings in real time to maximize oil production and minimize water cut. 

During equipment testing and installation, and subsequent flow testing of the well, each of the valves was actuated through more than 10 complete cycles?110 position changes, or the equivalent of several years of typical operation. The well was fully flow-tested and put on production with minimal water production. Saudi Aramco engineers reported at the 2007 IPTC meeting that without the intelligent well approach, the well would have watered out and ceased production.

Tubing- and wireline-retrievable flow control valves. These intelligent flow control valves, unlike their predecessors, do not require wireline or coiled tubing intervention to close, open, or infinitely adjust the flow area. Instead, they are remotely actuated through a hydraulic capillary tube (left) or, in the case of the electrical systems, through an electrical signal to electromechanical actuators (right). Both valves shown are tubing-retrievable.
相關(guān)技術(shù)裝備
2011-03-03 16:49:45 ·“膨脹套管完井修井關(guān)鍵技術(shù)”獲一等獎(jiǎng)
2010-12-29 10:55:22 ·勝利灘淺海無(wú)污染鉆完井液技術(shù)通過(guò)山東省成果鑒定
2010-08-04 14:21:27 ·冀東油田南堡43-X4806井完井
2010-07-07 10:10:47 ·勝利油田首次成功應(yīng)用海上旋轉(zhuǎn)尾管完井技術(shù)
2010-06-28 16:28:40 · 在线观看xxxx| 精品免费囯产一区二区三区 | 国产精品一区免费观看| 国产福利在线| www.欧美免费| 同性gay免费| 精品视频999| 蜜臀久久99精品久久久| 日韩毛片一二三区| 日韩欧美高清在线观看| 国产精品一区专区| 欧美图片一区二区| 亚洲美女一区| 亚洲欧美偷拍另类| 精品一级毛片| 久久这里只有精品8| 祥仔av免费一区二区三区四区| 成人av免费看| 中文字幕在线观看播放| 国产成人精品在线视频| 桃花色综合影院| 精品国产视频在线| 四虎黄色影院| 国产视频亚洲视频| 轻轻操 在线观看| 日韩欧美高清dvd碟片| 先锋影音欧美四级| 欧洲精品视频在线观看| 免费看av毛片| 精品国产91久久久久久老师| 国产美女www爽爽爽视频| 国产精品电影院| 免费av网站在线| 久久综合九色欧美综合狠狠| 成人免费毛片东京热| 国产精品一区一区| 女人裸体性做爰全过| 久久99精品久久只有精品| 91中文字幕永久在线| 久久亚洲视频| 天堂久久久久久| 免费日韩一区二区| chinese麻豆新拍video| 一区二区三区高清视频在线观看| 亚洲在线观看网站| 国产一区二区中文| 永久看看免费大片| 尹人成人综合网| 欧美一级片在线免费观看| 精品成人一区| 国产在线观看免费播放| 一本色道久久综合一区| 亚洲一区二区偷拍| 国语对白精品一区二区| 日本在线视频播放| 国产欧美高清| 亚洲一区二区三区综合| 玖玖在线精品| 国产男男chinese网站| 免费人成黄页网站在线一区二区 | 免费精品在线视频| 国产不卡免费视频| 免费人成在线观看| 99国产精品久久久久| 日韩大片免费在线观看| 国产欧美日韩不卡免费| 欧美三级网站在线观看| 亚洲三级在线观看| a在线观看视频| 色综合天天综合狠狠| 影音先锋男人资源站| 欧美日韩不卡在线| 国产成人福利| 亚洲男人的天堂在线播放| av电影免费| 欧美激情国内偷拍| 国产69精品久久app免费版| 国产精品三级在线| 爱情岛亚洲播放路线| 精品乱色一区二区中文字幕| 亚洲高清影院| 777久久精品一区二区三区无码 | 国产精品视频yy9099| 日本中文字幕中出在线| 国产伦精品一区二区三区在线 | 久久久久久国产免费| аⅴ资源新版在线天堂| 国产日韩在线视频| 韩国久久久久久| 亚洲在线观看一区| 羞羞答答一区二区| 一路向西2在线观看| 一本色道久久| 日本不卡一区视频| 久久精品一级爱片| 国产裸体永久免费无遮挡| 色婷婷综合视频在线观看| 久热国产视频| 亚洲欧美制服综合另类| 亚洲第一中文av| 激情av在线| 欧美日韩高清免费| 成人h动漫免费观看网站| 欧美精品色婷婷五月综合| 亚洲精品小说| 青青草视频成人| 成人综合在线网站| 国产免费一区二区三区四区五区| 午夜视黄欧洲亚洲| 麻豆精品国产自产在线| 亚洲美女性视频| 在线播放中文字幕| 成人av资源在线播放| 88xx成人网| 蜜臀av色欲a片无码精品一区| 亚洲一区二区三区无吗| aaaaa级少妇高潮大片免费看| 成人h精品动漫一区二区三区| 中文字幕一区二区人妻视频| 黑人巨大精品欧美一区二区三区 | 美女与牲口做爰视频在线观看| 久久久极品av| 黄色在线论坛| 奇米888一区二区三区| 免费视频国产一区| 精品国产aⅴ一区二区三区东京热 久久久久99人妻一区二区三区 | 中文字幕国产欧美| 亚洲欧美国产va在线影院| 色资源在线观看| 成人av播放| 日本成人7777| 亚洲一区二区三区四区av| 成人教育av在线| 国产女人高潮时对白| 欧美一卡二卡在线观看| 日本视频一二区| 亚洲一区二区三区在线免费观看| 日韩精品成人| 最新免费av网址| 国产黄色精品网站| 国产视频在线观看免费| 日韩欧美卡一卡二| 在线播放你懂得| 国产精品视频福利| 欧美禁忌电影网| 人妻丰满熟妇av无码久久洗澡| 久久久久久久综合狠狠综合| 亚欧洲精品视频| 在线成人激情黄色| aaa大片在线观看| 国产av第一区| 国产亚洲毛片在线| 亚洲国产成人精品激情在线| 一本色道亚洲精品aⅴ| 91在线精品| 97超碰人人看人人| 久久最新网址| 天堂资源在线视频| 亚洲午夜视频在线观看| 黑人巨大狂躁日本妞在线观看 | 国产精品一区二区不卡视频| 亚洲第一福利专区| 日韩精品卡通动漫网站| 中文字幕一区二区三区在线播放 | 中文字幕一区二区日韩精品绯色| 欧美成人精品福利网站| 欧美高清视频在线| 欧美成人免费电影| 日本在线观看a| 国产一区999| 亚洲男人第一天堂| 国产亚洲欧美视频| 欧美人与性动交α欧美精品图片| 日韩成人三级视频| 日韩中文欧美在线| 在线观看国产精品入口男同| 欧美精品一区二区三区高清aⅴ | 欧美一区亚洲二区| 牛夜精品久久久久久久99黑人| 欧美日韩免费做爰视频| 色综合久久综合| 色av一区二区三区| 精品国产免费一区二区三区| 亚洲成人精选| 日产亚洲一区二区三区| 欧美嫩在线观看| 理论在线观看| 亚洲综合激情五月| 天堂资源在线中文精品| 97人妻一区二区精品免费视频 | 免费黄色的网站| 国产在线视频一区| 免费观看久久av| 亚洲欧美综合7777色婷婷| 欧美性猛交xxxx乱大交极品| 米奇777在线影院线| 免费毛片一区二区三区久久久| 午夜国产精品视频| 三级网站在线播放| 欧美精品一区二区高清在线观看 |